Part 112N4105-30

Part was 2.3 metres long and required:

  • Ultrasonic testing of raw material
  • CNC Machining
  • Shotpeening
  • Painting
  • Part required EASA Form 1

End User

MRO urgently needed to deliver aircraft to Russian airline

DOA

Boeing SMAL together with DOA appointed and project managed by TEG

Delivery Time  

9 days

Customer feedback

MRO approached TEG because Boeing could not deliver part for several months. A SMAL was issued from the MRO and DOA appointed by TEG. The rapid response ensured aircraft was flying in time for busy Christmas period.