Part 112N4105-30
Part was 2.3 metres long and required:
- Ultrasonic testing of raw material
- CNC Machining
- Shotpeening
- Painting
- Part required EASA Form 1
End User
MRO urgently needed to deliver aircraft to Russian airline
DOA
Boeing SMAL together with DOA appointed and project managed by TEG
Delivery Time
9 days
Customer feedback
MRO approached TEG because Boeing could not deliver part for several months. A SMAL was issued from the MRO and DOA appointed by TEG. The rapid response ensured aircraft was flying in time for busy Christmas period.
